Henan Qimeng mechanical equipment Co., Ltd
Place of Origin: | Zhengzhou City |
Brand Name: | QIMENG |
Certification: | MAKA |
Model Number: | Non-drying compound fertilizer production line |
Minimum Order Quantity: | One set |
---|---|
Price: | Negotiable |
Packaging Details: | Wooden box |
Delivery Time: | 15-30 work days |
Payment Terms: | L/C |
Supply Ability: | fifteen set per month |
High Light: | 22KW Compound Fertilizer Production Line,5000kg/H Compound Fertilizer Production Line,5000kg/H organic manure making machine |
---|
Non-drying compound fertilizer production line
Overview of dry-Free compound fertilizer production line
No drying process, granulation at room temperature, one-time molding, less investment, quick effect, good economic benefits and high price ratio.
1.2. The production line without drying compound fertilizer has small power, reliable operation, no discharge of three wastes, stable operation, convenient maintenance, reasonable process layout, advanced technology and low production cost.
1.3. The raw materials have a wide range of suitability, which can be used for granulation of various raw materials such as compound fertilizer, medicine, chemical feed, coal, metallurgy, etc., and can produce various concentrations and types (including organic fertilizer, inorganic fertilizer, raw fertilizer, magnetic fertilizer, etc.) compound fertilizer.
1.4. Especially rare earth, ammonium bicarbonate and ammonium sulfate are compound fertilizer granulation, which fills the domestic blank and ranks the leading level in the country. It is the promotion project of applicable technologies for national environmental protection.
2. Installation and maintenance of non-drying compound fertilizer production line the maintenance of the machine is an extremely important and regular work, which should be closely coordinated with extremely operation and overhaul, etc, there should be full-time personnel to check on duty. Installation Test run:
2.1 The equipment should be installed on the basis of horizontal concrete and fixed with anchor bolts.
2.2. Pay attention to the vertical between the host body and the horizontal body when installing.
2.3. After installation, check whether the bolts of each part are loose and whether the main engine warehouse door is fastened. If so, please fasten it.
2.4. Configure the power line and control switch according to the power of the equipment.
2.5. After the inspection is completed, conduct an empty load test run, and the production can be carried out after the test run is normal.
Contact Person: sales